A Quotation Is Only Useful When the Scope Behind the Total Is Clear.
Two quotations with different totals cannot be properly compared unless the customer also compares the work, specifications, allowances, exclusions and responsibilities included within each one.
Why Does the Level of Detail Matter?
Connected Trades
Renovations often involve building work, plumbing, electrics, plastering, joinery and finishing trades that must be coordinated in the correct sequence.
Existing Properties Contain Uncertainty
Hidden services, previous alterations and defects may only become visible after strip-out or opening-up work begins.
Specifications Affect the Cost
Products, finishes, quantities and performance requirements can significantly change the final project investment.
A Headline Total Is Not Enough
A lower figure may exclude work, products or responsibilities that another quotation has included.
Customer and Project Details
A Clear Description of the Intended Project
The quotation should clearly identify the overarching goal of the renovation before detailing the individual stages.
What Is Changing?
Identify the rooms involved, walls or openings being altered and the intended finished result.
Which Documents Apply?
Reference architectural drawings, structural information, schedules and the relevant proposal version.
What Level of Completion Is Expected?
Clarify whether the project ends at a structural, plastered, ready-to-decorate or fully finished stage.
The Scope Should Be Divided Into Logical Stages
Preparation and Construction
- Preliminaries and protection
- Strip-out and removal
- Structural alterations
- General building work
Mechanical and Electrical
- Plumbing and heating
- Electrical installation
- Ventilation and extraction
- Final testing and certification
Internal Installation and Finishes
- Boarding and plastering
- Kitchen or bathroom installation
- Internal carpentry
- Flooring and decoration
Completion and Handover
- Waste removal
- Final connections
- Testing and inspections
- Final walkthrough and handover
Specifications Remove Uncertainty
Where materials and products are included, the quotation should detail exactly what is being supplied to avoid misunderstandings during the build.
Product or Manufacturer
The selected manufacturer, range or equivalent standard.
Finish
Colour, material, surface and visible finish.
Dimensions
Known dimensions, sizes or required clearances.
Quantity
The number of products, fittings or components included.
Performance Requirements
Thermal, fire, acoustic, security or other required performance.
Supply Responsibility
Whether Milano or the customer is supplying and ordering the product.
What Is an Allowance?
Allowances Should Be Visible and Adjustable
An allowance is an estimated amount included for a part of the project that cannot yet be finally priced because the design, quantity or product selection is not confirmed.
Example: structural steel allowance
A quotation may include an allowance for the structural steel package before the engineer’s final drawings are available. Once the design is confirmed, the allowance can be adjusted to match the actual specification.
- State what the allowance covers
- Explain whether labour, delivery and VAT are included
- Explain how the final adjustment will be calculated
Exclusions Prevent Assumptions
By clearly listing what is not included in the quotation, both parties have clarity and avoid unexpected costs later in the project.
- Decorating
- Worktops
- Planning fees
- Structural-engineer fees
- Building Control fees
- Asbestos removal
- Hidden defects
- Specialist products
- Customer furniture
- Work not shown on the drawings
These are examples only. The actual exclusions must be stated within the individual project proposal.
The Payment Schedule Should Use Clear Triggers
Deposit
A contribution towards securing the programme, preparation and committed materials where applicable.
Progress Payments
Payments linked to clearly identified stages of the agreed project.
Completion Stage
A defined payment linked to practical completion or another stated milestone.
Final Balance
The remaining payment made in accordance with the project-specific proposal.
Milano uses project-specific payment schedules. The exact percentages and payment triggers must be shown in the accepted proposal.
Programme Information Should Explain More Than a Start Date
Estimated Start Date
When the project is anticipated to begin on site.
Expected Project Duration
The overall timeframe estimated to reach practical completion.
Product Lead Times
Timeframes required for manufacturing made-to-order items.
Customer Decisions Required
Deadlines for confirming finishes to keep the project on track.
Inspection or Approval Dependencies
Key stages requiring sign-off before work can continue.
Possible Delays Outside the Contractor’s Control
Factors like weather or external suppliers that may affect timing.
An estimated programme is not the same as an absolute guarantee. The quotation should explain the assumptions and dependencies behind the dates.
Changes Should Be Agreed Clearly
Describe the Change
Explain exactly what is being added, removed or altered.
Confirm the Effect
State the change to cost, materials, programme and other work.
Obtain Written Approval
Record the customer’s agreement before progressing wherever reasonably practical.
What Happens When Hidden Issues Are Discovered?
Existing buildings can conceal conditions that could not reasonably have been identified before work began. A quotation should explain how these issues will be reported, assessed and agreed before additional work proceeds.
Insurance, Guarantees and Warranties
Public Liability Insurance
Confirms that suitable cover is in place for relevant liabilities, but it is not itself a guarantee of the finished workmanship.
Workmanship Guarantee
The quotation or contract should explain the period, start date, reporting process and applicable terms.
Product Warranties
Manufacturer warranties may apply separately to products, appliances and customer-supplied items.
Guarantees do not remove or replace statutory consumer rights.
Questions to Ask Before Accepting a Renovation Quotation
- Is VAT included?
- Are the relevant drawings referenced?
- Are important products and finishes specified?
- Are allowances clearly identified?
- Are exclusions listed?
- Is waste removal included?
- Who coordinates each trade?
- How are variations agreed?
- What triggers each payment?
- What happens if hidden issues are discovered?
- What insurance is in place?
- What guarantee applies?
A Headline Total Versus a Properly Defined Quotation
Headline Total Only
- One overall figure
- Few product details
- Unclear allowances
- Limited exclusions
- No defined variation process
- Difficult to compare properly
Properly Defined Quotation
- Clear scope
- Referenced drawings
- Product specifications
- Visible allowances
- Listed exclusions
- Payment and variation process
A detailed quotation is not automatically more expensive. It simply provides greater clarity about what the price represents.